The Cost to Build, the Cost to Borrow, and the Return You’re Left With
July 24, 2026
Christina Comelli - Comelli Commercial - Commercial Property Management

Ten years of construction costs, funding costs and yields – and why a built asset is looking better than a building site

Every property investment ultimately rests on three numbers: what it costs to create or acquire the asset, what it costs to fund it, and what it pays you back. For most of the past decade those three numbers moved in an investor’s favour. Construction costs crept along at a few per cent a year, money was almost free, and yields – while never spectacular – comfortably cleared the cost of debt. That equation has now broken down, and the past six months have made it materially worse.

Ten years in one picture

Construction costs cost of funds and property yields 2016 1026. Yield series are indicative national midpoints

Construction costs, cost of funds and property yields, 2016–2026. Yield series are indicative national midpoints.

The top panel shows the cost of building. Since 2016, Australian construction costs have risen by roughly 60% – a run that includes the record 11.9% spike of 2022, a brief return to trend, and a fresh acceleration now underway. Quantity surveyors Altus Group have lifted their 2026 escalation forecasts to between 6% and 9.5% across the major capitals, up sharply from the numbers they published only months earlier.

The bottom panel shows the other two sides of the triangle. The cash rate spent half the decade heading toward zero – bottoming at 0.10% during COVID – then travelled to 4.35% in one of the fastest tightening cycles on record. After brief relief through 2025, three consecutive hikes returned it to 4.35% by May 2026, with the Reserve Bank explicitly citing higher fuel and commodity prices. Yields, meanwhile, have done comparatively little. Residential gross yields have drifted from the high 3s to the high 4s; prime industrial yields compressed hard to 2022 and have settled around 5.7%. The uncomfortable arithmetic: the cost of creating an asset is up 60%, the cost of funding it has more than doubled from its decade average, and the income the asset generates has moved by one or two percentage points.

The war premium is only starting to land

If that were the whole story, it would be a cyclical squeeze. What makes 2026 different is that a structural layer is being added on top – and most of it has not yet reached contract prices.

The conflict in the Middle East and the near-closure of the Strait of Hormuz – the channel for roughly a fifth of the world’s oil – sent diesel up 41% in a single month, from $1.81 to $2.56 a litre. Australia imports around 90% of its fuel, and diesel is embedded in every material category: batching, freight, cranage, plant. Cement suppliers have already applied fuel surcharges of over $8 per cubic metre. Petrochemical supply chains have been damaged at the source, with one major plumbing supplier confirming price rises of 36% across selected pipe categories. Copper is up more than 25% year to date. Layer on the fallout from the ongoing war in Ukraine and new anti-dumping duties of up to 82% on imported Chinese steel, and the input picture darkens further.

Critically, the major cost data collections closed before the Hormuz disruption hit. The escalation now visible in forecasts is the contained scenario; quantity surveyors warn that prolonged disruption could add a further 2–3% a year on top. Anyone signing a construction contract today is pricing tomorrow’s materials with yesterday’s data.

An economy that compounds the problem

The broader economy is not offering any offsets. Headline inflation has climbed back to 4.6% – its highest since 2023 – led by an 8.9% annual rise in transport costs and 6.5% in housing, the two categories most directly wired into construction. Building insolvencies remain elevated, thinning the subcontractor pool and handing surviving trades stronger pricing power just as unions push for settlements above 4%. Dwelling approvals fell 10.5% in March, and the national housing program is running 27.5% behind its required delivery rate. Fewer builders, dearer trades, dearer materials, dearer money: every input to the development equation is moving the wrong way at once.

There is also the quieter problem of the dollar itself. At 4.6% inflation, the purchasing power of money halves in roughly 15 years. The dollar you commit to a two-year construction program buys measurably less building at completion than it did at contract signing – and the rent you collect at the end has to justify not just the headline cost, but the eroded value of every dollar spent along the way.

Built versus building: where the risk actually sits

This is the heart of the argument. Buying an established, income-producing asset removes development risk entirely – no planning uncertainty, no feasibility that dies when rates move, no leasing-up period. But it is the construction risk that the current environment punishes most brutally. A development is a promise to buy materials and labour at unknown future prices. Fixed-price contracts are increasingly hard to obtain, and where builders do offer them, the risk premium is priced in – or the builder is one insolvency away from handing the risk straight back. Escalation clauses, provisional sums and cost-plus arrangements all mean the same thing: if something happens – another supply shock, another fuel spike, a subcontractor failure – the blowout lands on the owner. In a market where the data lags the disruption, contingency allowances that looked conservative at feasibility can be consumed before the slab is poured.

A built asset, by contrast, is priced today, in today’s dollars, with income from day one. And rising replacement cost is not its enemy but its friend: every percentage point added to the cost of building new effectively underwrites the value of what already stands. When it costs 60% more to replace a building than it did a decade ago, the existing building has a moat.

The return problem

None of this means established assets are cheap or that returns are easy. With the cash rate at 4.35% and fully-priced debt sitting above it, a residential yield in the 4s barely covers interest before a single outgoing is paid – and after the 2026 tax reforms, the losses on an established dwelling can no longer be swept against other income. Prime industrial and commercial assets, yielding in the mid-5s to 6s with longer leases and tenants covering outgoings, at least start the race ahead of the cost of funds. The gap between what an asset earns and what the money costs has become the entire game – and it is a game that favours standing income over promised income.

The challenge of the next decade will not be finding growth; inflation alone will manufacture nominal growth. The challenge will be securing a real return – income that clears the cost of funds, in an asset that does not ask you to underwrite an open-ended construction bill to get it. Right now, that points firmly toward the built asset over the building site, and toward assets whose yields still clear the cost of the money behind them.

This article is general information only and does not constitute financial, tax or legal advice. Figures are drawn from published industry sources (CoreLogic/Cotality, Altus Group, RBA, ABS, CBRE) and yield series are indicative; individual assets and markets vary widely. Obtain professional advice before making investment decisions.

At Comelli we work with clients across Australia to ensure property ownership structures are aligned with their broader financial business and investment strategies

About Comelli Commercial

We help commercial property owners across the Illawarra make informed decisions about the management, leasing and sale of their assets. With local market knowledge and a practical, commercially focused approach, the team works to protect property income, reduce avoidable risks and support stronger long-term performance.

To discuss your commercial property, contact the Comelli Commercial team.